A small bicycle manufacturer in Mississauga wants to start to make two new types of electric bicycles. Each type of electric bicycle will require assembly time, inspection time, and storage space. The amounts of each of these resources that can be devoted to the production of these bicycles are limited. The manager of the firm would like to determine the quantity of each type of bicycle to produce in order to maximize the profit generated by sales of these. In order to develop a suitable model of the problem, the manager has met with the design and manufacturing personnel. As a result of those meetings, the manager has obtained the following information: