Which are not risks attached to running a proof of concept? expecting the POC to prove a business case. trying to solve a real operational problem with the POC. setting too high of an expectation on the deliverables getting started on the wrong process. a. 1 and 3 b. 2 and 4 c. 1 and 4 d. 2 and 3