A machine has one power setting. Suppose it takes the machine an amount of time, t_(0), to do a certain amount of work, W_(0). How much work could the machine do in four times the time, 4t_(0)?
A) W_(0)
B) 2W_(0)
C) 3W_(0)
D) 4W_(0)