The only force acting on a 2.9 kg canister that is moving in an xy plane has a magnitude of 7.5 N. The canister initially has a velocity of 3.9 m/s in the positive x direction, and some time later has a velocity of 5.1 m/s in the positive y direction. How much work is done on the canister by the 7.5 N force during this time?