It is calculated that the workstation cycle time is 80 seconds. The theoretical minimum number of workstations needed is 4 stations. Balance the line (assign tasks to sequential workstations) using the largest number of the following tasks, Use the longest task time as a secondary criterion. F-H D C-G A-B-E