M9.5 Peter Sagan is in charge of maintaining hospital supplies at Champs Hospital. During the past year the mean weekly demand for a special type of tubing was 186 packages of this tubing with a standard deviation of 13 packages of tubing. The lead time for receiving this tubing from the supplier is 1.5 weeks. Peter would like to maintain a 95% service level and places an order for 750 packages every time an order is placed. a) How much safety stock should be used for a 95% service level