A machine at a graphic design studio produces paper labels for juice bottles. This graph represents the number of labels produced over time.

Zoom in if you cannot see!

Don’t answer if you don’t know the answer. Whoever gets the correct answer will get Brainliest! :)

A machine at a graphic design studio produces paper labels for juice bottles This graph represents the number of labels produced over time Zoom in if you cannot class=

Respuesta :

Answer:

Option B, would be the correct answer: 75 labels per minute

Step-by-step explanation:

The number of labels produced per minute would be a constant value which would be the slope of this graph represented above.

Slope = [tex]\frac{rise}{run}[/tex]

Slope = [tex]\frac{150}{2}[/tex]

Slope = 75

Hope this helps!

I think it’s 150 since 1 minute= 150 labels